Category Archives: Project

Westgold Wastewater Treatment Plant

Another pair of Ecofarmer 250 units on deck for one of our mining clients in Western Australia. Arranged in twin train Ecofarmer 250 design with a Class A advanced media polishing packaged to ensure we meet our clients site compliance.

 

Client: Westgold

Location: Western Australia

Project: Westgold Cue Village WWTP upgrade

Solution: Twin Train Eco250 units with class a polishing package

Industry: Mining

 

Background:

The current waste water treatment facility situated at Cue Village Westgold needed to be replaced due to age and premature wear on the steel structure.

RWWA was asked to submit a proposal to design and construct a suitable waste water treatment system that suited the site hydraulic and incoming biological nutrient demand that would meet the release criteria as specified by governing body.

The new sewage treatment plant (STP) is designed to provide ongoing reliable service and to minimise maintenance requirements, ensuring ease of operation whilst maintaining reliable effluent quality and daily production.

Westgold Wastewater Treatment Plant

The site compliance targets are based on standard nutrient with Class A disinfection requiring less that 10 Ecoli per 100 ml of sample. Our Ecofamer SBR solution is packaged and delivered complete with our integral Class A glass media filtration system, that will further filter the supernatant from the sequencing batch reactors (SBR) to a higher class of final effluent, to release to ground.

 

Our glass media design is based on the ‘Drydan Glass,’ a validated and certified media product sold here in Australia. This is a highly refined crushed glass with excellent flux potential, allowing for full rejuvenation through a backwash and chemical clean process that extends to the filtration cycle, as oppose to conventional sand base media.

 

Our Class A media package is housed in a 20 ft high cube container beside our Ecofarmer treatment units. A dedicated feed pump on the VSD control, will continually recirculate the supernatant fluid over the glass media. Then the flow pace chlorine injection will sanitise the water keeping the media beds at optimal working order, whilst reducing fouling potential free residual oxidant. This will then be monitored and corrected for bacteriological control in the final effluent water body. Once the water has met specification within the chlorine contact residence time, a modulating valve will allow fluid to pass to the irrigation field.

As part of our advanced technology, a centralised Allen Bradley HMI and PLC will engage the operator allowing for full remote access, reducing any unnecessary call out fees.

Results:

The RWWA difference is our unique fabrication process of our engineered certified steel reactors that provide a generous 20 year chassis life guarantee. Our chassis are built from the ground up with 6 mm flat sheet formed and pressed for the walls giving the ultimate in rigidity and corrosion allowance. In addition, a suitable international or Jotun coating is applied to the internal and exterior of the box.

We are committed to providing the highest quality product and service to our customers.

Water Treatment Plant Project

Our client chose a custom built surface water treatment plant to produce safe and reliable potable water for human consumption.

Solution: 40ft containerised Surface Water Treatment System

Industry: Agriculture

 

BACKGROUND

Our client was constructing new and upgrading existing facilities to support industry activity that is requiring a suitable water treatment facility to cater for persons on site.

We supplied a 40ft containerised surface water treatment system to produce safe and reliable potable water for human consumption.

When accessing the design of the surface water treatment plant we took into account some key consideration based on site specific risks and project requirements.

Requirements for the WTP for this application were as follows:

 

Variable site loads – load swings and variable quality raw water characteristics

Seasonal Variance affecting organic loads, TOC Levels and Algae Levels in raw water supply

Upstream Catchment Assessment shows the source water as Category 4

Upstream variability in raw water quality including cattle farming – cryptosporidium risk is high.

High Protozoa risks associated with the source water combined with the location of the catchment and temperature averages.

Indicative raw water test results show an extremely low LSI index (corrosive Index rating) resulting in the design requiring remineralisation as an addition to the primary process requirement.

20 year design life with an acceptable ongoing cost

THE SOLUTION

CUSTOM BUILT WATER TREATMENT PLANT

We designed and constructed a surface water treatment plant with a nominated design flow rate to provide a minimum of 75,000 litres per day.

The nominated recovery range for this system was 85% – with a worst case expected recovery during very high solids loading periods of 55%.

Raw water required for the 20 kl per day potable water was between 88,500 litres per day minimum and as high as 136,000 litres per day – depending on raw water quality.

There was several stages of the water treatment process implemented into the design and construction of this customize water treatment plant including;

 

Stage One – Chemical Dosing

Stage Two- AFM Media Filtration

Stage Three – Ultrafiltration

Stage Four – GAC Carbon Media Filtration

Stage Five – Ultraviolet Disinfection Post Filtration

Stage Six – Calcite Media Remineralisation Filtration

Stage Seven – Chlorine Dosing For Disinfection Post Filtration

Stage Eight – Chlorine Dosing And Ph Correction For Treated Water Storage Facility

 

OVERVIEW OF DESIGN AND SYSTEM FITOUT

The following key summary points outline the fitout of the system:

 

Electrical Control Panel/Switchboard – Exceeds AS 3000 Requirement

Custom Fabricated 40 Foot Container Based Building with Air Conditioning, Vinyl Flooring, Fridge Panel 50 mm Thick Insulation Panel Lined Internal Roof and Walls for Temperature Control.

Allen Bradley Micro-logix series PLC and Colour 10 inch HMI Screen Interface

Remote Dial In and SMS out E-Won Cosy Modem Platform for remote assistance support and alarm notifications.

Industry Standard high quality electrical components such as Schnieder, Hager and Finder.

415 volt/240 volt segregated from 24 volt compartment

Overloads and Circuit breakers accessible from safe outer door to internal retainer door mounted position – no exposed terminals

Earth Leakage to AS 3500.

External Building Colour of clients choice

The water treatment system included a Grundfos CRIE15 Series duplex multistage pump set complete with variable speed drive motors. A PID Pressure targeting software control via an Allen Bradley PLC/HMI package was installed.

The pump set was sized to ensure each pump delivered 15l/sec @40 mtrs delivery head, allowing a duty standby control methodology, which allowed a final duty achieved of 10 ltrs second at 400 kpa.

A flow meter was installed on the treated water delivery line out of the system to monitor discharge flows. This would ensure the data logging of usage volumes and peak flows as well as ensuring if there were any issues an alarm would be triggered to alert operations immediately.

Results:

There was significant consideration into the site-specific risks for treatment and delivery in design and construction to ensure the final filtered and disinfected water in potable water storage complied with the Australian Drinking Water Guidelines (ADWG).

We delivered a potable water treatment plant that provided a daily minimum of 75,000 litres of safe and reliable potable water for human consumption.

The water treatment system was designed and fabricated in a transportable/semi-permanent or permanent installation arrangement to provide continuous service with the required maintenance for a 20 year life expectancy.

NEED AN INNOVATIVE SYSTEM THAT DOES NOT FAIL?

If you are wanting a water treatment system that works all day every day with the ability of remote monitoring, please call one of our friendly engineering team today to discuss your waste water issues and how we can help.

Australian Potash LTD | Sewage Treatment Plant

Client: Australian Potash LTD

Location: Western Australia

Solution: Ecofarmer SNR 250 Class A Package

Industry: Agriculture

 

Background:

Australian Potash LTD are developing a new facility at Lake Wells near the Laverton Region of Western Australia.

The operational facility will accommodate up to 120 full time staff and the facility has an expected operational life of up to 30 years.

As a part of the ongoing site utility and services management – a new sewage treatment system will be installed to cater for treatment of the sites sewage waste from the accommodation facility.

The new sewage treatment plant (STP) is to be designed to provide ongoing reliable service and to minimise maintenance requirements, and ensure ease of operation whilst maintaining reliable effluent quality and daily production.

Although the current site modelling is for only 120 persons to accommodate full time, RWTS sized the system to accommodate up to a maximum 250 persons to allow for any potential future expansions of facility.

Westgold Resources Water and Wastewater Treatment Plant

Client: Westgold Resources

Industry: Mining

Systems: EcoFarmer Wastewater Treatment Plant, Reverse Osmosis Water Treatment System

BACKGROUND

Westgold Resources, a top 10 Australian gold producer, recently began operations on their fourth Western Australian project – Cue Gold Operations. In order to manage the wastewater of their 200-man remote accommodation village at the Big Bell Underground Mine, Westgold approached RWTS to design and manufacture a wastewater treatment system. This same site also required a water treatment system to transform he local raw (bore) water into high quality drinking water as deemed by the Australian Drinking Water Guidelines.

 

RWWA Solution

This project was an ideal candidate for the EcoFarmer 250 Wastewater Treatment Plant which utilises a Sequential Batch Reaction (SBR) process. Although this is a standard process throughout the water treatment industry, RWWA emphasised the functionality of the plant from the initial design stages. Through the seamless collaboration between our in-house engineering and electrical divisions, smart automation was integrated for enhanced productivity with less operator intervention.

How does the automation work?

The plant continually revises code as it observes the plant’s flow. When limited flow is achieved throughout the day, a standby code automatically seizes control of the plant and in peak periods the extended code will drive the plant.

In addition, Westgold Resources will reap the benefits of the EcoFarmer, that come as standard in this turnkey range, including:

 

– Robust steel construction to withstand harsh, remote environmental conditions

– Seamless transportability, attributed to the ISO shipping container design

– Premium Allen Bradley HMI (interface) and PLC control system

– Biological treatment process pre-approved by state regulatory bodies

 

Guaranteed & Certified Design

The design was accepted with process and structural certification by REPQ.

All stringent Western Australian department of health requirements where achieved, including a 20-year design life on the plant.

The structural steel shell was manufactured sandblasted, primed and painted with an International shipping coating internally. As part of our manufacturing process, spark testing was completed across the vessel to proactively identifying any potential issues with weld and coating. This ensured the integrity of the internal and external coating surface.

RWWA designed and manufactured a reverse osmosis potable water treatment system to meet the potable water requirements of the Westgold Big Bell remote workers’ village.

 

Built to Last

As the industry specialist in packaged water treatment systems, we decided to containerise the RO system. This allowed for ease of transportation and protection of the system from harsh rural environmental conditions.

For optimal insulation, the internal plant room was lined with 75 mm foam-filled panelling on the walls and ceiling, and air-conditioning system was integrated to ensure ideal operating temperature through the hotter and cooler months.

User-Centred Design and Automation for Streamlined Operation

The treated water recirculation monitoring and dosing control platform was our internal proprietary offering. This specialist feature is able to measure chlorine pH and conductivity, utilising the new range of Burkert flow fit cubes with gateway Ethernet, and display these levels in real-time on the PLC HMI plant platform.

Our internal programming and instrumentation division designed and custom-built the HMI to be single interface of all plant monitoring, streamlining plant observation and operation. This thoughtful feature allows Westgold to reduce operating costs and rapidly identify and respond to any potential issues.

As with all RWTS chemical injection systems, this Westgold system was fitted with Burkert Viton solenoids and Mazzi Venturi systems. Again, these offer fully programmable control through the HMI system, enabling the operator to take control at any time. A

The RWWA Brackish water reverse osmosis design also features flux targeting through flow metering with secondary pressure monitoring. This allows the RO system to maintain flux across the filter elements in permeate and concentrate streams through modulating v-notch ball valves. This is common on large scale membrane projects, however, in the price-driven remote camp market, it is often overlooked, and flows are set with manual tuning valves. This unfortunately is detrimental to the life of the membrane, resulting in more frequent membrane replacements and increasing the long-term operating costs of the plant.

 

Smart Technology for Flexible Monitoring & Control

RWWA uses the latest Allen Bradley HMI and PLC platform for full control of all our plants. These systems have a wireless router allowing for full remote dial-in access through site wifi. This is a must in the ever-changing water and wastewater servicing industry. It allows the plant performance and parameters to be viewed anywhere, anytime. Imagine the ease of troubleshooting over the phone with your site-based operator as you monitor the plant’s performance in real-time. That’s the RWWA difference.

Categories
Recent Posts
Recent Comments
    Archives
    Meta
    Categories
    Recent Posts
    Recent Comments
      Archives
      Meta
      Tags
      Request a Quote

      Request a Quote
      DO YOU STILL HAVE A QUESTION REGARING OUR SERVICES?

      WordPress Video Lightbox